Friday, September 28, 2018










PRODUCT PHOTO :-

MODERN DUST BIN













Working video

A VIDEO WITH USER USING OUR PRODUCT

ETHINOGRAPHY STUDY AT RAMPUR DUMPING YARD





PHASE-1 BATCH-2
TOPIC
- SOLID WASTE MANAGEMENT
SOCIETAL RELEVANCE
MENTORS – SAMPATH REDDY SIR
            SHASHANK SIR
TEAM MEMBERS
 - YESHWANTH KUMAR
                      LAXMAN
                    HARISH
                         BHAWANA
                       SUDHEER
                            PRASHANTH



A community is a small or large scale works of same caste , religion , values , or identity.
Example : pot makers ; handloom makers
A society is the group of people of different castes and religion sharing the same geographical or virtual territory
SOCIETAL RELEVENCE

Concept about solid waste management
 ETHNOGRAPHIC STUDY
Started our interview with a municipal health officer of GWMC ( Dr. B. RAJAREDDY M.B.B.S )
DATA COLLECTED
Swachh autos of 129 in number.                           each auto can collect nearly  600 houses each auto has 2 workers to collect garbage 
Old process use to have pushcarts
    1 pushcart 200 houses with 2 workers total of 625 in number.
collecting of garbage is divided into 4-stages
     collecting from recommended areas.
Dry resource cycling center
Transporting to the main treatment plant in Rampur
Treatment in Rampur
Calculations of GWMC
Each man from one house can produce 300 grams of garbage per day around 600 houses can collect 180 kilograms per day , treatment plant has a capacity of 400 metric tonnes per day only 30 metric tonnes can be done by GWMC remaining transferred to dumping yard.
Man power of GWMC is around 2680 members .
TREATMENT PROCESSES OF GWMC
Vermicompost capacity of 60 metric tonnes adopted manure is sold to the farmers .
Windrow compost capacity of 5 metric tonnes sold to the farmers.
Organic compost with capacity of 1 metric tonne using as manure for the plantation done by the corporation.
Future plans of GWMC
Incineration helps to produce electric power .
Biomethanation where organic material is converted into bio-gas.
Both has a capacity of 500 metric tonnes.
Observations made..
Improper disposal of dry waste and wet waste
Improper collection of garbage by corporation
Negligence towards dry resource cycling center.
Disposing the garbage into small ponds with out recycling.
Disposing the garbage at out of the city but near the agricultural fields.
EPICS - PHASE 2 – REPORT
Prior Art Search Document
Need statement: It is the very problem to face separate the dry and wet waste at homes.so we want to develope a new product to separate thedry and wet waste at home it self.
An autonomous floor cleaning robot includes a transport drive and control system arranged for autonomous movement of the robot over a floor for performing cleaning operations. The robot chassis carries a first cleaning zone comprising cleaning elements arranged to suction loose particulates up from the cleaning surface and a second cleaning zone comprising cleaning elements arraigned to apply a cleaning fluid onto the surface and to thereafter collect the cleaning fluid up from the surface after it has been used to clean the surface. The robot chassis carries a supply of cleaning fluid and a waste container for storing waste materials collected up from the cleaning surface.
CONCLUSION:
1.A robot is used for performing cleaning operations.
2.A robot is used for collecting dry and wet waste.
MODERN DUSTBIN
                             We the team of students are interested, fascinated to contribute our knowledge in order to help the society in a better means.with this focus,we undergo a societal survey and observe some common problems that need solutions under the guidance of  Darna Sai Shashank,Assistant Professor,Center for Design.

Our theme:To meet the societal needs.

point of focus:Among several societal needs we intended to meet requirements of warangal muncipality corporation on basis of solid waste management

NEED STATEMENT:-

                  The main problem is improper segregation of wet waste & dry waste. so, we want to develop a new product called modern dustbin.

COMMUNITY PARTNER:-

                                     DR.B.RAJAREDDY,
                                     Municipal Health Officer,
                                     Greater Warangal Municipal Corporation.
TEAM MEMBERS:-

                     project leader: s.yeshwanthkumar
                     project manager: N.laxman 
                     web designers: A.sudheer,G.harish
                     financial managers:ch.bhavana,Ch.Prashanth

S.YESHWANTH KUMAR
PROJECT LEADER

                                                   
                           
CH.PRASHANTH
FINANCIAL MANAGER

CH.BHAVANA
FINANCIAL MANAGER

A.SUDHEER KUMAR
WEB DESIGNER

N.LAXMAN 
PROJECT MANAGER



G.HARISH
WEB DESIGNER





                                 

PRODUCT PHOTO :- MODERN DUST BIN Working video